marqey
Manufacturing

When the plan changes, production updates instantly

From order to work order and from material to cost, production moves on a single record. You see missing material, progress on the line, quality results and actual cost while production is still running.

Plan, material, quality and cost on the same production record

Manufacturing

This solution gathers the order, the production plan, the bill of materials, material requirements, the work order, quality results and cost on a single record. Material needs surface before production starts; actual cost surfaces while the job is still running. In the classic setup the plan lives on a board, the product knowledge in the foreman's head, quality on a separate form and cost in accounting. marqey unites them on the same record: planning sees deadlines and capacity, the shop floor moves on the work order, finance reads cost straight off the job.


How You Solve It

The work order ties to the plan, quality ties to cost

Production moves in seven steps; the work order does not stand alone. A role runs each step, each step creates a record in the system, and the next step continues from that record.

The plan is set

The planning lead weighs the order, inventory and capacity together; a production plan record forms, and it becomes clear which job starts and ends when.

The bill of materials goes on record

The production lead writes materials, scrap and operation steps into the bill of materials; product knowledge stops depending on one person, and every work order draws from the same bill of materials.

Material requirements are calculated

The plan is compared against the bill of materials; missing raw material turns into a purchase request, and the purchasing lead follows the supplier and goods receipt through that request.

The work order reaches the floor

Planning releases the job to the floor as a work order; raw material issued for a job is deducted from that work order, so warehouse and line see the same quantity.

Production and quality are logged

The floor team logs operation steps from the station; inspection results, rejects and scrap sit on the work order with their cause, and management watches progress as it happens.

Cost accumulates on the work order

Material, labour and expenses build up while the job runs; finance reads actual cost off the work order, and profit or loss does not wait for month-end closing.

Finished goods in, shipment out

The warehouse books the finished product into stock after the quality step; lot and serial data traces backwards, and the shipment record closes the order.

What Do You Gain?

Confidence in deadlines, control over cost

  1. Quote delivery dates with confidence

    Plan, capacity and material sit on the same screen; the deadline rests on solid data, and sales sees what is on the shelf apart from what is in production.

  2. Cut line stoppages

    Missing material, waiting jobs and quality risk are spotted without stopping production; purchasing steps in on time.

  3. See cost before the job ends

    Material, labour and scrap collect on the same work order; cost stops being a surprise line item.

Frequently Asked Questions

Which manufacturing records need to share a work order?

The bill of materials, material demand, operation, actual output, scrap, quality result and cost should connect to the same work order. This gives planning and the shop floor one current production record.

Which teams use Manufacturing?

Planning, shop floor, warehouse, purchasing, quality and finance. Each role sees its own screen. The work order record is shared.

Can our bills of materials and stock cards be migrated?

Product cards, bills of materials and inventory data move over in bulk. What a foreman keeps in memory is written down together as part of the migration plan.

Does our accounting setup change?

You keep working with your accountant. marqey runs the manufacturing, inventory and cost side. The records that go to accounting arrive orderly and complete.

Which business example shows Manufacturing in use?

At Yeka Plastik, a plastic goods manufacturer, production was structured around work centres. Raw material, semi-finished and finished stock became traceable in its own layer, and unit cost is read straight off the work order.

How You Start

Let's map out your production structure together

Who keeps the bill of materials, who opens the work order, who deducts material, who watches cost: let's assess it together. See marqey in a demo close to your own production routine; together we decide which steps, approvals and roles you need.

Let's define the right scope for your business

Share your request; together we choose the products and the starting setup that fit.

Starting Point

Choose the right route for your business

Explore the products, or go by your business model, the setup you use today and your priorities.

Not sure yet? We can help.

WhatsApp